{"id":250,"date":"2024-10-23T17:27:54","date_gmt":"2024-10-23T09:27:54","guid":{"rendered":"http:\/\/www.soaring.com.cn\/en\/?page_id=250"},"modified":"2025-01-07T22:04:01","modified_gmt":"2025-01-07T14:04:01","slug":"case-study1-game-changing-validation-lab-helped-catlkick-off-a-new-battery-plant","status":"publish","type":"page","link":"http:\/\/www.soaring.com.cn\/en\/?page_id=250","title":{"rendered":"Case Studis-1"},"content":{"rendered":"\n

Game-changing Validation Lab Helped C Kick Off a New Battery Plant<\/h2>\n\n\n\n
\"\"<\/figure>\n\n\n\n

Background<\/h2>\n\n\n\n

In 2019, C, the world’s largest EV battery manufacturer, broke ground on C, its first battery cell manufacturing plant outside of China, located in Thuringia, Germany. With a total investment of 1.8 billion Euros, C aimed to begin commercial production by the end of 2022. To meet this ambitious timeline, it was critical for C to build a highly efficient validation lab to ensure battery quality, accelerate time to market, and reduce production costs.<\/p>\n\n\n\n

Challenge<\/h2>\n\n\n\n

The C validation lab faced the challenge of validating their batteries for a wide range of local customers in Germany, including those in the EV, grid, and commercial application sectors. Each application had unique performance requirements, which necessitated a variety of test protocols and processes that differed from those used in China.<\/p>\n\n\n\n

Solution<\/h2>\n\n\n\n

Working closely with C engineers, Soaring helped establish a highly flexible validation lab for C. Soaring adopted a modular approach to customize the testing solution, allowing C to quickly reconfigure the lab for different types of tests. Soaring also provided a skilled team with diverse expertise and experience, capable of handling the wide range of test requirements.<\/p>\n\n\n\n

Results & Benefits<\/h2>\n\n\n\n

Soaring’s solution helped C successfully kick off commercial production in December 2022. C’s highly flexible validation lab became a competitive advantage, enabling the company to accelerate time to market, safeguard product quality, and reduce production costs.<\/p>\n","protected":false},"excerpt":{"rendered":"

Game-changing Validation Lab Helped C Kick Off a New Battery Plant Background In 2019, C, the world’s largest EV battery manufacturer, broke ground on C, its first battery cell manufacturing plant outside of China, located in Thuringia, Germany…<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"http:\/\/www.soaring.com.cn\/en\/index.php?rest_route=\/wp\/v2\/pages\/250"}],"collection":[{"href":"http:\/\/www.soaring.com.cn\/en\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/www.soaring.com.cn\/en\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/www.soaring.com.cn\/en\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.soaring.com.cn\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=250"}],"version-history":[{"count":4,"href":"http:\/\/www.soaring.com.cn\/en\/index.php?rest_route=\/wp\/v2\/pages\/250\/revisions"}],"predecessor-version":[{"id":483,"href":"http:\/\/www.soaring.com.cn\/en\/index.php?rest_route=\/wp\/v2\/pages\/250\/revisions\/483"}],"wp:attachment":[{"href":"http:\/\/www.soaring.com.cn\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=250"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}